​20   West Melton Stormwater Scheme


20.1       Scheme Summary


Description​ Quantity
Scheme Area ​​
163.42 ha
Scheme Coverage (as at 1 Jan 2021)Rating numbers734
System components ​​ ​​ ​​ ​​ ​
Piped (m)6,610
Swales (m)7,306
Drains (m)0
Manholes/Inspection Chambers (No.)76
Treatment6 Infiltration basins
Other57 soakholes
Value ($)

Replacement Cost $3,584,615
Depreciated Replacement Cost $3,346,407
Financial
Operator cost (scheduled and reactive maintenance) per connection​

$60.14/connection

Planning ​
Stormwater Management PlanUpdated 2021
No. SDC stormwater consents1
Demand ​
Mean Annual Rainfall (mm)642
10% AEP (10 year) 1hr rainfall depth (mm)19.6
SustainabilitySustainable drain management practicesAdopted and Encouraged

 

20.2       Key Issues

The following key issues are associated with the West Melton Stormwater Scheme.  A list of district wide issues are located in 5Waters Activity Management Plan: Volume 1.

Table 20‑1 West Melton Scheme Issues

What's the Problem​ What we plan to do
New stormwater systemMonitor performance of new systems

 

20.3       Overview & History

The majority of the West Melton stormwater assets are within the Gainsborough and Prestons Down subdivision.  The system comprises a network of swales discharging to stormwater basins.​

​​​
​​ Figure 20-1
WEST MELTON Stormwater - Scheme map

Open larger map: 'Stormwater Scheme'


V4 West Melton - Scheme Schematic.jpg

Figure 20‑2 Scheme Schematic


20.4       Resource Consents

There is a global consent held by Selwyn District Council for this stormwater management area. 

Table 20‑2 Resource Consents

Consent​

Description Location Date Issued Expiry Date

CRC167467

Issued - Active

to discharge contaminants into and onto landWest Melton, Selwyn12/04/201712/04/2052

 

20.5       Integrated Stormwater Management Plan

An ISMP has been approved for West Melton. The ISMP was last updated in 2021.

 

20.6       Scheme Assets

Council has a wide variety of stormwater assets within the district. A brief description of the assets within this scheme is provided below:

a.      Swale (Grassed) – Is a longitudinal open channel which is lined with grass.  The swale both conveys and treats stormwater.

b.      Soakage trench – Carries out the same function as soakholes but is orientated in a horizontal direction rather than vertically.  They are particularly useful in areas with reduced infiltration rates or higher ground water tables.

c.      Reticulated network – Includes pipes, manholes, sumps.  The primary purpose of the reticulated network is to collect and convey stormwater.  Historically these systems were designed for the 2 year storm event.  Today's engineering standards require the piped network to be designed for a 10 year event with overland flow provision for up to the 50 year event.

d.      Infiltration basin – is a stormwater management device which is used to store, treat and dispose of stormwater to the ground via soakage.

e.      Soakholes – Are used to dispose of stormwater to ground in areas where the ground water table is low and soil permeability is high.   

A summary of material and diameter for channels and pipes, where known, is shown below in Figure 20‑3 and Figure 20‑4.

​Figure 20‑3 Pipe Material – West Melton


​Figure 20‑4 Pipe Diameter – West Melton

 

20.7       Operational Management

The stormwater network is operated and maintained under two maintenance contracts as follows:

  • Contract 1241: Water Services Contract.  Contract is with SICON who undertakes investigations, conditions inspections, proactive and reactive maintenance and minor asset renewals.
  • Contract 1202: Parks and Reserves Contract.  Contract is with SICON who undertakes the maintenance of land scape features related to water services e.g. mowing, gardens etc.

Water quality sampling is completed under an agreement with Food and Health Ltd as required.

 

20.8       Photos of Main Assets

The photos below provide a summary of the types of assets found within this stormwater management area.

V4 West Melton - Photo 1 – Basin 1 Gainsborough.jpg
Photo 1 – Basin 1 Gainsborough
V4 West Melton - Photo 2 – Basin 2 Gainsborough.jpg
Photo 2 – Basin 2 Gainsborough

 

20.9       Rapid Flood Modelling

The Council has undertaken 'Rapid Flood Hazard Assessment' modelling for its main townships.  The modelling uses DHI MIKE 21 to simulate rainfall on grid with the outputs processed through ArcGIS producing maps illustrating a range of flood deeps during different rainfall intensities and durations.

The rapid flood assessment has been generated to provide a high level summary of potential flood and ponding areas across the district during extreme rainfall events. The results from this study are not to be used to set floor levels.  The results have not been ground tested and therefore are indicative only.   

For a 50 year event, Figure 20‑5 shows the predicted flooding for West Melton

V4 West Melton - Rapid Flood Modelling, West Melton.jpg

Figure 20‑5 Rapid Flood Modelling, West Melton


20.10       Risk Assessment

A risk assessment has been undertaken for the West Melton scheme. The key output from the risk assessment is the identification of any extreme and high risks which need to be mitigated. In order to mitigate these risks they have been included and budgeted for in the projects within this LTP. Table 20‑3 details the risk priority rating and Table 20‑4 outlines the risks.

Table 20‑3 Risk Priority Rating

Risk Score​​ Level of Risk Risk Response
> 50Extreme

Awareness of the event to be reported to Council. 

Urgent action to eliminate / mitigate / manage the risk.

Document risk and action in the AMP.

35-50Very HighRisk to be eliminated / mitigated / managed through normal business planning processes with responsibility assigned.
14-35HighManage risk using routine procedures.
3.5-14ModerateMonitor the risk.
< 3.5Low

Awareness of the event to be reported to Council. 

Immediate action required to eliminate / mitigate / manage the risk.

Document risk and action in the AMP.


Table 20‑4 Risks – West Melton

Risk​ Action/Project Year Identified 2014 Risk Rating 2017 Risk Rating Residual Risk Rating
Non-consented activitiesRenewal of consents201427276


The list of district wide risks can be found in 5Waters Activity Management Plan: Volume 1.

 

20.11       Asset Valuation Details

The total replacement value of assets within the West Melton Scheme is $3,584,615 as detailed in Table 20‑5 below. 

Table 20‑5 Replacement Value, West Melton

Asset Class 1​​ Asset Class 2 Sum of Replacement Value
​Stormwater Reticulation ​​ ​​ ​​ ​​ ​​
Channel$443,528
Inlet-Outlet-Point$248,269
Management Device$455,545
Manhole$543,490
Pipe$1,816,539
Soakhole$77,244


20.12       Renewals

The renewal profile has been taken from the 2019 5 Waters Valuation. A graph showing the renewals for this scheme are shown by Figure 20‑6 below. The majority of assets requiring renewal are culverts/pipes which occur in the year 2025/26, 2039 to 2042.

​​Figure 20‑6 West Melton Stormwater Renewal Profile

 

20​.13       Critical Assets

The criticality model for West Melton has been updated for the 2021 AcMP. The methodology of the criticality model can be found in 5Waters Activity Management Plan: Volume 1 and it provides details of how the criticality has been calculated for the reticulation assets. Table 20‑6 and Figure 20‑7 below show the calculated criticality for all of the assets within this scheme that have a recorded known length.

​Table 20‑6 Length of Assets per Criticality Level

Criticality Bands​ Length (m)
5
Low9,672
4
Medium-Low888
3
Medium495
2
Medium-High0
1
High34​


​​​
​​ Figure 20-7
WEST MELTON Stormwater - Criticality map

Open larger map: 'Stormwater Criticality'


20.14       Asset Condition

The asset condition model was run for West Melton in 2021. The methodology of the model can be found in 5Waters Activity Management Plan: Volume 1 and it provides details of how the model has been calculated for the reticulation assets (particularly pipes). Figure 20‑8 below shows the level of asset condition for all of the assets within this scheme that have a recorded known condition.

​​​
​​ Figure 20-8
WEST MELTON Stormwater - Condition map

Open larger map: 'Stormwater Condition'

Table 20‑7 provides a description of the condition rating used within the condition model.

Table 20‑7 Asset Condition Grading

Condition Rating​ Grading
1.0Excellent
2.0Good
3.0Moderate
4.0Poor
5.0+Fail

 

20.15       Funding Program

The 10 year budgets are shown by Table 20‑8​. Bu​dgets are split into expenditure, renewals, projects and capital projects. Expenditure and renewals have been reported on a district-wide basis in Volume 1. 

All figures are ($) not adjusted for CPI “inflation".  They are calculated on historical data, and population growth where relevant.​

Table 20‑8 Budget Summary

Years Projects Capital Projects
2021/2022 -
-
2022/2023
 -
$10,000
2023/2024 -
-
2024/2025 -
-
2025/2026 -
-
2026/2027 -
-
2027/2028 -
2028/2029
 -
-
2029/2030
 -
-
2031/2032
 -
-
Total -
$10,000

An explanation of the categories within the budgets are as follows below:

  • Expenditure consists of operation and maintenance costs;
  • Renewals are replacement of assets which are nearing or exceeded their useful life;
  • Projects are investigations, decisions and planning activities which exclude capital works; and
  • Capital projects are activities involving physical works.

Table 20​‑9​ Key Projects

Account Label GL Description​  Year 1($)  Year 2($)  Year 3($) Years 4 to 10 Funding Split *
​Capital Projects
-
Weedons Ross Road swale upgrades
​-
$10,000
​-
​-
100% LoS

 * Where LoS refers to Level of Service and G refers to Growth

The list of district wide projects can be found in 5Waters Activity Management Plan: Volume 1.

Discussion on Projects

Projects​​​ have been determined based on their:

  • Relevance to the scheme
  • Requirement to be completed under legislation
  • Ability to bring the scheme up to or maintain the Level of Service required under council's Asset Management Policy. 

Many projects are jointly funded by more than one scheme and activity.  Each scheme pays a pro-rata share only, equivalent to the number of connections.

Discussion on Capital and Projects

Where relevant, Capital (Levels of Service) and Capital (Growth) projects have been included in the scheme financial details. 

Levels of Service Projects and growth splits have been provided to ensure the costs of population driven works are clear.​​​​