​​​​​​​​​​​​​<< ​​5-Waters-Volume-4-Stormwater​​
​​​​​​​​​​​​​​​​​​<< ​​Hororata Stormwater Scheme​​​
Lake Coleridge Stormwater Scheme​​​​​ >>​​​

​​​​9   Kirwee Stormwater Scheme


9.1       Scheme Summary


Description​ Quantity
Scheme Area ​
199.65ha
Scheme Coverage (as at 1 Jan 2021)Rating numbers370​
System components ​​ ​​ ​​ ​​ ​
Piped (m)520​
Swales (m)3,707
Drains (m)0
Manholes/Inspection Chambers (No.)0
Treatment2 rain gardens
Other77 soakholes
Value ($) ​
Replacement Cost $171,976
Depreciated Replacement Cost $159,530
Financial
Operator cost (scheduled and reactive maintenance) per connection​

$8.03/connection

Planning ​
Stormwater Management PlanDraft
No. SDC stormwater consents1
Demand ​
Mean Annual Rainfall (mm)663
10% AEP (10 year) 1hr rainfall depth (mm)20.1
Sustainability
Sustainable drain management practicesAdopted and Encouraged

 

9.2       Key Issues

The following key issues are associated with the Kirwee stormwater Scheme.  A list of district wide issues are located in 5Waters Activity Management Plan: Volume 1.

​Table 9‑1 Kirwee Scheme Issues

What's the Problem​​ What we plan to do
Increased expectation from the community regarding level of service received from the stormwater network Identify capacity restrictions in the system, design upgrades and budget for physical works.

 

9.3       Overview & History

Kirwee is located at the junction of West Coast and Tramway Roads.  Within the township, stormwater is predominantly conveyed and treated by roadside swales and discharged to ground via soakpits.  The exception to this is Glen Oak Drive where treatment is provided by rain gardens. ​

​​​
​​ Figure 9-1
KIRWEE Stormwater - Scheme map

Open larger map: 'Stormwater Scheme'


V4 Kirwee - Scheme Schematic.jpg

Figure 9‑2 Scheme Schematic


9.4       Resource Consents

There is a global discharge consent held by Selwyn District Council for this stormwater management area.

Table 9‑2 Resource Consents

Consent​

Description Location Date Issued Expiry Date

CRC167466

Issued - Active

To discharge contaminants into and onto landKirwee, Selwyn12/04/201712/04/2052

 

9.5       Integrated Stormwater Management Plan

Environment Canterbury's Land and Water Regional Plan  became operative on the 13th December 2018.  Under policy 4.16, any reticulated stormwater system for an urban area requires a stormwater management plan. Additionally, from 1 January 2025, operators of reticulated stormwater systems will become responsible for the quality and quantity of all stormwater discharged from the reticulated stormwater system. The Kirwee stormwater management plan was updated in 2021 and submitted to ECan. ​

 

9.6       Scheme Assets

Council has a wide variety of stormwater assets within the district. A brief description of the assets within this scheme is provided below:

a.      Reticulated network – Includes pipes, manholes, sumps.  The primary purpose of the reticulated network is to collect and convey stormwater.  Historically these systems were designed for the 2 year storm event.  Today's engineering standards require the piped network to be designed for a 10 year event with overland flow provision for up to the 50 year event.

b.      Open drains – are channels used to convey stormwater.  They are cost effective means to convey large volumes of water.

c.      Swale (Grassed) – Is a longitudinal open channel which is lined with grass.  The swale both conveys and treats stormwater. 

d.      Soakholes – Are used to dispose of stormwater to ground in areas where the ground water table is low and soil permeability is high.    


​Figure 9‑3 Pipe Material - Kirwee


​Figure 9‑4 Pipe Diameter - Kirwee​


9.7       Operational Management

The stormwater network is operated and maintained under two maintenance contracts as follows:

  • Contract 1241: Water Services Contract.  Contract is with SICON who undertakes investigations, conditions inspections, proactive and reactive maintenance and minor asset renewals.
  • Contract 1202: Parks and Reserves Contract.  Contract is with SICON who undertakes the maintenance of land scape features related to water services e.g. mowing, gardens etc.

Water quality sampling is completed under an agreement with Food and Health Ltd as required.

 

9.8       Photos of Main Assets

V4 Kirwee - Photo 1 Typical stormwater basin.jpg
Photo 1: Typical stormwater basin

 

9.9       Rapid Flood Modelling

The Council has undertaken 'Rapid Flood Hazard Assessment' modelling for its main townships.  The modelling uses DHI MIKE 21 to simulate rainfall on grid with the outputs processed through ArcGIS producing maps illustrating a range of flood deeps during different rainfall intensities and durations.

The rapid flood assessment has been generated to provide a high level summary of potential flood and ponding areas across the district during extreme rainfall events. The results from this study are not to be used to set floor levels.  The results have not been ground tested and therefore are indicative only.   

For a 50 year event, Figure 9‑5 shows the predicted flooding for Kirwee.

V4 Kirwee - Rapid Flood Modelling, Kirwee.jpg

Figure 9‑5 Rapid Flood Modelling, Kirwee


9.10       Risk Assessment

A risk assessment has been undertaken for the Kirwee scheme. The key output from the risk assessment is the identification of any extreme and high risks which need to be mitigated. In order to mitigate these risks they have been included and budgeted for in the projects within this LTP. Table 9‑3 details the risk priority rating and Table 9‑4 outlines the risks for this scheme.

Table 9‑3 Risk Priority Rating

Risk Score​ Level of Risk Risk Response
> 50Extreme

Awareness of the event to be reported to Council. 

Urgent action to eliminate / mitigate / manage the risk.

Document risk and action in the AMP.

35-50Very HighRisk to be eliminated / mitigated / managed through normal business planning processes with responsibility assigned.
14-35HighManage risk using routine procedures.
3.5-14ModerateMonitor the risk.
< 3.5Low

Awareness of the event to be reported to Council. 

Immediate action required to eliminate / mitigate / manage the risk.

Document risk and action in the AMP.

 

Table 9‑4 Risks - Kirwee

Risk​ Action/Project Year Identified 2014 Risk Rating 2017 Risk Rating Residual Risk Rating
Non-consented activitiesRenewal of consents201427276


The list of district wide risks can be found in 5Waters Activity Management Plan: Volume 1.

 

9.11       Asset Valuation Details

The total replacement value of assets within the Kirwee Scheme is $171,976 as detailed in Table 9‑5 below.

Table 9‑5 Replacement Value, Kirwee

Asset Class 1​ Asset Class 2 Sum of Replacement Value
Stormwater Reticulation ​​ ​​ ​​
Channel$136,114
Management Device$5,314
Pipe$22,054
Soakhole$7,724


9.12       Renewals

The renewal profile has been taken from the 2019 5 Waters Valuation. A graph showing the renewals for this scheme are shown by Figure 9‑6 below. The majority of assets requiring renewal are culverts which occur in the year 2019/20.​

​Figure 9‑6 Kirwee Stormwater Renewal Profile

 

9.13       Critical Assets

The criticality model for Kirwee has been updated for the 2021 AcMP. The methodology of the criticality model can be found in 5Waters Activity Management Plan: Volume 1 and it provides details of how the criticality has been calculated for the reticulation assets. Table 9‑6 and Figure 9‑5​ below show​ the calculated criticality for all of the assets within this scheme that have a recorded known length.

Table 9‑6 Length of Assets per Criticality Level

Criticality Bands​ Length (m)
5
Low3,777​
4
Medium-Low0
3
Medium0
2
Medium-High0
1
High0


​​​
​​ Figure 9-7
KIRWEE Stormwater - Criticality map

Open larger map: 'Stormwater Criticality'


9.14       Asset Condition

The asset condition model was run for Kirwee in 2021. The methodology of the model can be found in 5Waters Activity Management Plan: Volume 1 and it provides details of how the model has been calculated for the reticulation assets (particularly pipes). Within this scheme there are no assets that have a recorded known condition.


9.15       Funding Program

There are no projects specific to the Kirwee scheme in the 10 year LTP budgets, however the scheme will benefit from a number of district-wide initiatives. Bu​dgets are split into expenditure, renewals, projects and capital projects. Expenditure and renewals have been reported on a district-wide basis in Volume 1. 

An explanation of the categories within the budgets are as follows below:

  • Expenditure consists of operation and maintenance costs;
  • Renewals are replacement of assets which are nearing or exceeded their useful life;
  • Projects are investigations, decisions and planning activities which exclude capital works; and
  • Capital projects are activities involving physical works.

The list of district wide projects can be found in 5Waters Activity Management Plan: Volume 1.

Discussion on Projects

Projects​​​ have been determined based on their:

  • Relevance to the scheme
  • Requirement to be completed under legislation
  • Ability to bring the scheme up to or maintain the Level of Service required under council's Asset Management Policy. 

Many projects are jointly funded by more than one scheme and activity.  Each scheme pays a pro-rata share only, equivalent to the number of connections.

Discussion on Capital and Projects

Where relevant, Capital (Levels of Service) and Capital (Growth) projects have been included in the scheme financial details. 

Levels of Service Projects and growth splits have been provided to ensure the costs of population driven works are clear.​​​​


<< ​​5-Waters-Volume-4-Stormwater​​
​​​​​​​​​​​​​​​​​​<< ​​Hororata Stormwater Scheme​​​
Lake Coleridge Stormwater Scheme​​​​​ >>​​​