​​​​​​​​​​​​​​​​​​​<< ​​5-Waters-Volume-4-Stormwater​​

​​​1​   Arthurs Pass Stormwater Scheme


1.1       Scheme Summary


Description​ Quantity
Scheme Area
23.18ha
Scheme Coverage (as at 1 Jan 2021)Rating numbers136​
System components ​​ ​​ ​​ ​​ ​
Piped (m)920
Swales (m)42
Drains (m)938
Manholes/Inspection Chambers (No.)7
Treatment2 (Humeceptor + Oil Interceptor)
OtherInfiltration trench
Value ($)

Replacement Cost $332,902
Depreciated Replacement Cost $270,933
FinancialOperator cost (scheduled and reactive maintenance) per connection​

$57.11/connection

Planning ​
Stormwater Management PlanDraft
No. SDC stormwater consents2
Demand ​
Mean Annual Rainfall (mm)4330
10% AEP (10 year) 1hr rainfall depth (mm)37.4
SustainabilitySustainable drain management practicesAdopted and Encouraged

 

1.2       Key Issues

The following key issues are associated with the Arthurs Pass Stormwater Scheme.  A list of district wide issues are located in 5Waters Activity Management Plan: Volume 1.

​Table 1‑1 Arthurs Pass Scheme Issues

What's the Problem​ What we plan to do
Area outside the Outdoor Centre floods from the surrounding hillsides during heavy rainfall.  Includes septic tank flooding.Monitor effectiveness of minor improvements made, determine responsibility.
Soakage trench by the Railway underpass has limited capacity and other floods during large rainfall events.Options analysis undertaken by Opus consultants in 2013 and Community Committee opted to improve maintenance and undertake no capital works.
Costs of undertaking maintenance works in the township are high including proprietary device cleaning due to travel distances.  Continue to work alongside roading contractor and the Community to achieve best value for money maintenance.

 

1.3       Overview & History

The Arthurs Pass stormwater system services the car and bus parking and public toilet facility at Arthur​​​​​​s Pass.  These facilities sit outside the NZTA system.  Stormwater from the "bus and car parking area" is directed via kerb and channel to a rock-lined swale, and then piped to a proprietary device before discharging to a gravel soakage trench.  Stormwater from the "DoC carpark" is directed via kerb and channel to a petrol and oil interceptor and then discharges via open drain to the same soakage trench.

Arthurs Pass has a high annual rainfall of 4330mm, which is the highest in the district.

The community committee raised concerns about the flooding of the underpass when the soakage trench capacity was exceeded (Refer to Photo 3 in Section 1.8). An investigation of options to improve drainage of the soakage trench was undertaken by Opus Consultants in 2013. The community committee opted to remain with the status quo with additional maintenance.

Flooding is known to occur outside the outdoor centre from the drain on private property behind the store, minor improvements to the culvert was made in 2013 by the roading team and will be monitored.

Due to the isolated nature of the community in Arthurs Pass, a high level of communication with the community committee is required to help identify issues and opportunities for improvement.

There are a number of stormwater issues in Arthurs Pass on private property which are outside Council control.​

​​​
​​ Figure 1-1
ARTHURS PASS Stormwater - Scheme map

Open larger map: 'Stormwater Scheme'

V4 Arthurs Pass - Scheme Schematic.jpg 

Figure 1‑2 Scheme Schematic


1.4       Resource Consents​

The Arthurs Pass stormwater scheme has a number of resource consents. Table 1‑2 shows the stormwater discharge permitted by the resource consents for this scheme.

Table 1‑2 Resource Consents

Consent

Description Location Date Issued Expiry Date

CRC080003

To discharge stormwater to land from roofing and hardstandState Highway 73, ARTHURS PASS30/10/200725/10/2042

CRC084392

To discharge hardstand stormwater to ground.
Cloudesley Road, BEALEY SPUR
 N/A
 N/A
​CRC186179
​To discharge stormwater to land and to surface water from the existing stormwater network of Arthur's Pass
​Arthur's Pass
​Application on hold
​-


Consent CRC084392 is located outside the stormwater management area but is included for completeness.

 

1.5       Integrated Stormwater Management Plan

Environment Canterbury's Land and Water Regional Plan ​became operative on the 13th December 2018.  ​​​Under policy 4.16, any reticulated stormwater system for an urban area requires a stormwater management plan. Additionally, from 1 January 2025, operators of reticulated stormwater systems will become responsible for the quality and quantity of all stormwater discharged from the reticulated stormwater system. The Arthur​​s Pass stormwater management plan has been lodged as part of the application for consent CRC186179​. ​

 ​

1.6       Scheme Assets

Council has a wide variety of stormwater assets within the district. A brief description of the assets within this scheme is provided below:

a.      Reticulated network – Includes pipes, manholes, sumps.  The primary purpose of the reticulated network is to collect and convey stormwater.  Historically these systems were designed for the 2 year storm event.  Today's engineering standards require the piped network to be designed for a 10 year event with overland flow provision for up to the 50 year event.

b.      Oil Interceptor – Is a proprietary device which uses baffles to trap and contain hydrocarbons (oils and fuels).

c.      Humeceptor -  Is a hydrodynamic separator which helps to reduce mass sediment load from the discharge, some removal of hydrocarbons is also achieved.

d.      Swale (Rock lined) – Is a longitudinal open channel which is lined with rocks.  The swale both conveys and treats stormwater.

e.      Soakage trench – Carries out the same function as soakholes but is orientated in a horizontal direction rather than vertically.  They are particularly useful in areas with reduced infiltration rates or higher ground water tables.

A summary of material and diameter for channels and pipes, where known, is shown below in Figure 1‑3 and Figure 1‑4.

​Figure 1‑3 Pipe Material – Arthurs Pass


​Figure 1‑4 Pipe Diameter – Arthurs Pass

 

1.7       Operational Management

The stormwater network is operated and maintained under two maintenance contracts as follows:

  • Contract 1241: Water Services Contract.  Contract is with SICON who undertakes investigations, conditions inspections, proactive and reactive maintenance and minor asset renewals.
  • Contract 1202: Parks and Reserves Contract.  Contract is with SICON who undertakes the maintenance of land scape features related to water services e.g. mowing, gardens etc.

Water quality sampling is completed under an agreement with Food and Health Ltd as required.

 

1.8       Photos of Main Assets

The photos below provide a summary of the types of assets found within this stormwater management area.


V4 Arthurs Pass - Photo 1 Soakage Trench.jpg
Photo 1: Soakage Trench



V4 Arthurs Pass - Photo 2 Rock lined swale.jpg
Photo 2: Rock lined swale

V4 Arthurs Pass - Photo 3 Arthurs Pass in Flood.jpg​​

Photo 3: Arthurs Pass in Flood

The soakage trench in Photo 1 requires an annual clean of accumulated sediment.

 

1.9       Rapid Flood Modelling

The Council has undertaken 'Rapid Flood Hazard Assessment' modelling for its main townships.  The modelling uses DHI MIKE 21 to simulate rainfall on grid with the outputs processed through ArcGIS producing maps illustrating a range of flood deeps during different rainfall intensities and durations.

The rapid flood assessment has been generated to provide a high level summary of potential flood and ponding areas across the district during extreme rainfall events. The results from this study are not to be used to set floor levels.  The results have not been ground tested and therefore are indicative only.   

For a 50 year event, no flooding is expected in Arthurs Pass.


1.10       Risk Assessment

A risk assessment has been undertaken for the Arthurs Pass scheme. The key output from the risk assessment is the identification of any extreme and high risks which need to be mitigated. In order to mitigate these risks they have been included and budgeted for in the projects within this LTP. Table 1‑3 details the risk priority matrix and Table 1‑4 outlines the risks for this scheme.

Table 1‑3 Risk Priority Rating

Risk Score​​ Level of Risk Risk Response
> 50Extreme

Awareness of the event to be reported to Council. 

Urgent action to eliminate / mitigate / manage the risk.

Document risk and action in the AMP.

35-50Very HighRisk to be eliminated / mitigated / managed through normal business planning processes with responsibility assigned.
14-35HighManage risk using routine procedures.
3.5-14ModerateMonitor the risk.
< 3.5Low

Awareness of the event to be reported to Council. 

Immediate action required to eliminate / mitigate / manage the risk.

Document risk and action in the AMP.


Table 1‑4 Risks – Arthurs Pass

Risk​​ Action/Project Year Identified 2014 Risk Rating 2017 Risk Rating Resid​ual Risk Rating
Non-consented activitiesRenewal of consents201427276
Network maintenancereview public / private drains2017 122
Scheme capacityinfiltration basin overflow design + consent2017 2712
Scheme capacityinfiltration basin overflow construction2017 2712


The list of district wide risks can be found in 5Waters Activity Management Plan: Volume 1.

 

1.11       Asset Valuation Details

The total replacement value of assets within the Arthurs Pass Scheme is $332,902 as detailed in Table 1‑5 below. 

Table 1‑5 Replacement Value, Arthurs Pass

Asset Class 1​ Asset Class 2 Sum of Replacement Value
​Stormwater Reticulation​
Channel$59,488
Inlet-Outlet-Point$17,280
Lateral$23,181
Management Device$37,648
Manhole$48,801
Pipe$146,503

 

​1.12       Renewals

The renewal profile has been taken from the 2019 5 Waters Valuation. A graph showing the renewals for this scheme are shown by Figure 1‑5 below. The majority of assets requiring renewal are culverts/pipes which occur in the year 2040/41.​

Figure 1‑5 Arthurs Pass Stormwater Renewal Profile

 

1.13       Critical Assets

The criticality model for Arthurs Pass has been updated for the 2021 AcMP. The methodology of the criticality model can be found in 5Waters Activity Management Plan: Volume 1 and it provides details of how the criticality has been calculated for the reticulation assets. Table 1‑6 and Figure 1‑6 below show​ the calculated criticality for all of the assets within this scheme that have a recorded known length.

​Table 1‑6 Length of Assets per Criticality Level

Criticality Bands​ Length (m)
5
Low711
4
Medium-Low216
3
Medium148
2
Medium-High0
1
High52​


​​​
​​ Figure 1-6
ARTHURS PASS Stormwater - Criticality map

Open larger map: 'Stormwater Criticality'
​​

1.14       Asset Condition

The asset condition model was run for Arthurs Pass in 2021. The methodology of the model can be found in 5Waters Activity Management Plan: Volume 1 and it provides details of how the model has been calculated for the reticulation assets (particularly pipes). Figure 1‑7​ below shows the level of asset condition for all of the assets within this scheme that have a recorded known condition.

​​​
​​ Figure 1-7
ARTHURS PASS Stormwater - Condition map

Open larger map: 'Stormwater Condition'

​Table 1‑7 provides a description of the condition rating used within the condition model.

Table 1‑7 Asset Condition Grading

Condition Rating​ Grading
1.0Excellent
2.0Good
3.0Moderate
4.0Poor
5.0+Fail

 

1.15       Funding Program

The 10 year budgets for Arthurs Pass are shown by Table 1‑10. Bu​dgets are split into expenditure, renewals, projects and capital projects. Expenditure and renewals have been reported on a district-wide basis in Volume 1. 

All figures are ($) not adjusted for CPI “inflation".  They are calculated on historical data, and population growth where relevant.​

Table 1‑8 Arthurs Pass Budget Summary

Years Projects Capital Projects
2021/2022 -
$30,000
2022/2023
 -
$480,000
2023/2024 -
$20,000
2024/2025 -
 -
2025/2026 -
 -
2026/2027 -
$150,000
2027/2028 -
2028/2029
 -
 -
2029/2030
 -
 -
2031/2032
 -
 -
Total -
$680,000

An explanation of the categories within the budgets are as follows below:

  • Expenditure consists of operation and maintenance costs;
  • Renewals are replacement of assets which are nearing or exceeded their useful life;
  • Projects are investigations, decisions and planning activities which exclude capital works; and
  • Capital projects are activities involving physical works.

Table 1​‑9​ Key Projects

Account Label GL Description​  Year 1($)  Year 2($)  Year 3($) Years 4 to 10 Funding Split *
​Capital Projects​
-
Underpass flooding; connect soakage basin to Bealey River via a high-level overflow
$30,000
$480,000
-
-
TBC
​Capital Projects
​-
​Punchbowl Creek piping; identify options for alternative flow paths from highway to Bealey River via Punchbowl Road
​-
​-
$20,000
​$150,000
​100% LoS

 * Where LoS refers to Level of Service and G refers to Growth

The list of district wide projects can be found in 5Waters Activity Management Plan: Volume 1.

Discussion on Projects

Projects​​​ have been determined based on their:

  • Relevance to the scheme
  • Requirement to be completed under legislation
  • Ability to bring the scheme up to or maintain the Level of Service required under council's Asset Management Policy. 

Many projects are jointly funded by more than one scheme and activity.  Each scheme pays a pro-rata share only, equivalent to the number of connections.

Discussion on Capital and Projects

Where relevant, Capital (Levels of Service) and Capital (Growth) projects have been included in the scheme financial details. 

Levels of Service Projects and growth splits have been provided to ensure the costs of population driven works are clear.​​


<< ​​5-Waters-Volume-4-Stormwater​​